LAPORAN PENCAPAIAN BAHAGIAN KHIDMAT PENGURUSANSUKU TAHUN KE-1 (JAN- MAC) TAHUN 2025 | |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMPROSES BAUCER BAYARAN | 14 HARI | |||
2 | URUSAN MENYEWA BAS COASTER | 7 HARI | |||
3 | URUSAN SEWA RUANG DAN KEMUDAHAN | 7 HARI | |||
4 | PERMOHONAN PELBAGAI LESEN |
| |||
5 |
|
| |||
6 | MEMPROSES PERUBAHAN EMOLUMEN | MERUJUK JADUAL PERUBAHAN GAJI YANG DIKELUARKAN OLEH BENDAHARI NEGERI | |||
7 | PERSARAAN WAJIB / PILIHAN | 6 BULAN | |||
8 | PERMOHONAN KUARTERS | 6 BULAN | |||
9 | MEMPROSES BAYARAN BANTUAN BENCANA | 3 HARI | |||
LAPORAN PENCAPAIAN BAHAGIAN KHIDMAT PENGURUSANSUKU TAHUN KE-2 (APRIL- JUN) TAHUN 2025 | |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMPROSES BAUCER BAYARAN | 14 HARI | |||
2 | URUSAN MENYEWA BAS COASTER | 7 HARI | |||
3 | URUSAN SEWA RUANG DAN KEMUDAHAN | 7 HARI | |||
4 | PERMOHONAN PELBAGAI LESEN |
| |||
5 |
|
| |||
6 | MEMPROSES PERUBAHAN EMOLUMEN | MERUJUK JADUAL PERUBAHAN GAJI YANG DIKELUARKAN OLEH BENDAHARI NEGERI | |||
7 | PERSARAAN WAJIB / PILIHAN | 6 BULAN | |||
8 | PERMOHONAN KUARTERS | 6 BULAN | |||
9 | MEMPROSES BAYARAN BANTUAN BENCANA | 3 HARI | |||
LAPORAN PENCAPAIAN BAHAGIAN KHIDMAT PENGURUSANSUKU TAHUN KE-3 (JULAI - SEPTEMBER) TAHUN 2025 | |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMPROSES BAUCER BAYARAN | 14 HARI | 849 BAUCER | 100% | - |
2 | URUSAN MENYEWA BAS COASTER | 7 HARI | 9 PERMOHONAN | 100% | - |
3 | URUSAN SEWA RUANG DAN KEMUDAHAN | 7 HARI | 29 PERMOHONAN | 100% | - |
4 | PERMOHONAN PELBAGAI LESEN |
| TIADA PERMOHONAN | 0% | LESEN EKSAIS :LESEN PENULISAN SURAT RAYUAN: |
5 |
|
| 2 PERMOHONAN | 100% | DALAM PROSES :MOHAMAD AZLI BIN EMBRANMUHAMMAD ASHMAAN BIN KAMARRAZAMAN |
6 | MEMPROSES PERUBAHAN EMOLUMEN | MERUJUK JADUAL PERUBAHAN GAJI YANG DIKELUARKAN OLEH BENDAHARI NEGERI | 63 PERMOHONAN | 100% | JULAI : 47OGOS: 9SEPTEMBER : 7 |
7 | PERSARAAN WAJIB / PILIHAN | 6 BULAN | 4 PERMOHONAN | 100% | BERSARA PAKSA :1. AZMI BIN RADZALI - 01/01/20262. ROHAIDAH BINTI MUHAMMAD - 18/02/20263. YATIMAH BINTI YAMIN - 27/07/2026BERSARA PILIHAN :1. MOHD TILAL FITRI BIN ABDUL RANI |
8 | PERMOHONAN KUARTERS | 6 BULAN | 3 PERMOHONAN | 100% | - |
9 | MEMPROSES BAYARAN BANTUAN BENCANA | 3 HARI | 13 PERMOHONAN | 100% | JULAI : 0OGOS : 11SEPTEMBER : 2 |
LAPORAN PENCAPAIAN BAHAGIAN KHIDMAT PENGURUSANSUKU TAHUN KE-4 (OKTOBER - DISEMBER) TAHUN 2025 | |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMPROSES BAUCER BAYARAN | 14 HARI | |||
2 | URUSAN MENYEWA BAS COASTER | 7 HARI | |||
3 | URUSAN SEWA RUANG DAN KEMUDAHAN | 7 HARI | |||
4 | PERMOHONAN PELBAGAI LESEN |
| |||
5 |
|
| |||
6 | MEMPROSES PERUBAHAN EMOLUMEN | MERUJUK JADUAL PERUBAHAN GAJI YANG DIKELUARKAN OLEH BENDAHARI NEGERI | |||
7 | PERSARAAN WAJIB / PILIHAN | 6 BULAN | |||
8 | PERMOHONAN KUARTERS | 6 BULAN | |||
9 | MEMPROSES BAYARAN BANTUAN BENCANA | 3 HARI | |||
LAPORAN PENCAPAIAN BAHAGIAN PEMBANGUNANSUKU KE-1 (JANUARI - MAC) TAHUN 2025
| |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMBERI MAKLUMBALAS KEPADA PERMOHONAN INFRASTRUKTUR YANG DITERIMA | 7 HARI | 71 PERMOHONAN | 100 | PERMOHONAN DITERIMA DARIPADA PENGERUSI MPKK DAN PENGHULU MUKIM MELALUI BORANG PERMOHONAN YANG TELAH DISEDIAKAN : DUN SABAK - 15 PERMOHONAN DUN SG AIR TAWAR - 10 PERMOHONAN DUN SG.PANJANG - 27 PERMOHONAN DUN SEKINCHAN - 19 PERMOHONAN |
2 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN AHLI DEWAN (ADN) SELANGOR, PEGAWAI PENYELARAS DUN DAN AHLI PARLIMEN DAERAH SABAK BERNAM YANG TELAH LENGKAP DI HANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 448 TUNTUTAN | 100 | PERMOHONAN BULAN JAN-MAC 2025 : ADN - 355 TUNTUTAN PARLIMEN - 93 TUNTUTAN |
3 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN ELAUN MENGHADIRI MESYUARAT / PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG TRADISI (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 258 TUNTUTAN | 100 | PERMOHONAN BULAN OKTOBER - DISEMBER 2024 258 TUNTUTAN (RM102,880.00) |
4 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENYELARASAN DOKUMEN MINIT MESYUARAT JPKK / KAMPUNG BAGAN BARU DAN TERSUSUN | 7 HARI | 36 TUNTUTAN MINIT | 100 | 36 TUNTUTAN MINIT (RM36,000.00) |
5 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PEMBAYARAN ELAUN MENGHADIRI PROGRAM / MESYUARAT KETUA KOMUNITI INDIA (KKI) | 7 HARI | 35 TUNTUTAN (2KKI) | 100 | 35 TUNTUTAN (RM1,400.00) |
6 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENGELUARAN PERUNTUKAN PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM DALAM TEMPOH 7 HARI BEKERJA | 7 HARI | 98 TUNTUTAN | 100 | PERMOHONAN BULAN JAN-MAC 2025 : KG TRADISI - 88 PROGRAM KG BAGAN - 10 PROGRAM KKI - 0
KG. TRADISI : SABAK - 19 (RM33,341.00) P.BEDENA - 18 (36,561.00) SG.PANJANG - 17 (RM32,860.00) P.PANJANG - 11 (RM17,930.00) B.N.OMAR - 23 (RM40,126.00) |
7 | MENGURUS PERMOHONAN PERUNTUKAN PROJEK KECIL INFRASTRUKTUR ( TERIMA PERMOHONAN, LAWATAN TAPAK, PENYEDIAAN BUTIRAN KERJA). SURAT TAWARAN, PEMANTAUAN DAN BAYARAN TERMASUK PROJEK JENIS BEKALAN YANG TELAH DILULUSKAN DI BAWAH PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN), PENYELARAS DUN DAN PENYELARAS PARLIMEN. | 4 MINGGU | 5 PERMOHONAN | 40 | ADN SABAK : 4 PERMOHONAN ADN SUNGAI PANJANG : 1 PERMOHONAN |
LAPORAN PENCAPAIAN BAHAGIAN PEMBANGUNANSUKU KE-2 (APRIL - JUN) TAHUN 2025
| |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMBERI MAKLUMBALAS KEPADA PERMOHONAN INFRASTRUKTUR YANG DITERIMA | 7 HARI | - | 100 | PERMOHONAN DITERIMA DARIPADA PENGERUSI MPKK DAN PENGHULU MUKIM MELALUI BORANG PERMOHONAN YANG TELAH DISEDIAKAN : DUN SABAK - 15 PERMOHONAN DUN SG AIR TAWAR - 10 PERMOHONAN DUN SG.PANJANG - 27 PERMOHONAN DUN SEKINCHAN - 19 PERMOHONAN |
2 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN AHLI DEWAN (ADN) SELANGOR, PEGAWAI PENYELARAS DUN DAN AHLI PARLIMEN DAERAH SABAK BERNAM YANG TELAH LENGKAP DI HANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 428 PERMOHONAN | 97.9% | APRIL : 126 PERMOHONAN MEI : 191 PERMOHONAN JUN : 111 PERMOHONAN 9 PERMOHONAN (JUN) MELEBIHI TEMPOH PELAKSANAAN 7 HARI DOKUMEN KUARI (TIDAK LENGKAP) |
3 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN ELAUN MENGHADIRI MESYUARAT / PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG TRADISI (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 2029 TUNTUTAN | 100 | APRIL : 593 TUNTUTAN MEI : 790 TUNTUTAN JUN : 646 TUNTUTAN |
4 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENYELARASAN DOKUMEN MINIT MESYUARAT JPKK / KAMPUNG BAGAN BARU DAN TERSUSUN | 7 HARI | 36 TUNTUTAN | 100 | APRIL : 12 TUNTUTAN MEI : 12 TUNTUTAN JUN : 12 TUNTUTAN |
5 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PEMBAYARAN ELAUN MENGHADIRI PROGRAM / MESYUARAT KETUA KOMUNITI INDIA (KKI) | 7 HARI | 30 TUNTUTAN | 100 | APRIL : 10 TUNTUTAN MEI : 10 TUNTUTAN JUN : 10 TUNTUTAN |
6 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENGELUARAN PERUNTUKAN PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM DALAM TEMPOH 7 HARI BEKERJA | 7 HARI | 230 TUNTUTAN | 86.5 % | APRIL : 59 PROGRAM (8TUNTUTAN PROGRAM MELEBIHI TEMPOH PELAKSANAAN 7 HARI) MEI : 94 TUNTUTAN (12 TUNTUTAN PROGRAM MELEBIHI TEMPOH PELAKSANAAN 7 HARI) JUN : 77 TUNTUTAN (11 TUNTUTAN PROGRAM MELEBIHI TEMPOH PELAKSANAAN 7 HARI) |
7 | MENGURUS PERMOHONAN PERUNTUKAN PROJEK KECIL INFRASTRUKTUR ( TERIMA PERMOHONAN, LAWATAN TAPAK, PENYEDIAAN BUTIRAN KERJA). SURAT TAWARAN, PEMANTAUAN DAN BAYARAN TERMASUK PROJEK JENIS BEKALAN YANG TELAH DILULUSKAN DI BAWAH PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN). | 2 MINGGU | 8 | 100 | ADN SG.PANJANG - 4 PKM SG.PANJANG - 3 ADN SABAK - 1 |
| 8 | PENYEDIAAN DAN PENGELUARAN SURAT TAWARAN KEPADA KONTRAKTOR PROJEK KECIL INFRASTRUKTUR BAGI PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN), PENYELARAS DUN DAN PENYELARAS PARLIMEN. | 4 MINGGU | 8 | 100 | ADN SG.PANJANG - 4 PKM SG.PANJANG - 3 ADN SABAK - 1 |
| 9 | PELAKSANAAN PROJEK INFRASTRUKTUR BAGI PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN), PENYELARAS DUN DAN PENYELARAS PARLIMEN (SEHINGGA PROJEK SIAP DILAKSANAKAN) | 6-8 MINGGU | 8 | 100 | ADN SG.PANJANG - 3 PKM SG.PANJANG - 3 ADN SABAK - 1 |
LAPORAN PENCAPAIAN BAHAGIAN PEMBANGUNANSUKU KE-3 (JULAI - SEPTEMBER) TAHUN 2025
| |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMBERI MAKLUMBALAS KEPADA PERMOHONAN INFRASTRUKTUR YANG DITERIMA | 7 HARI | 71 PERMOHONAN | 100 | PERMOHONAN DITERIMA DARIPADA PENGERUSI MPKK DAN PENGHULU MUKIM MELALUI BORANG PERMOHONAN YANG TELAH DISEDIAKAN : DUN SABAK - 15 PERMOHONAN DUN SG AIR TAWAR - 10 PERMOHONAN DUN SG.PANJANG - 27 PERMOHONAN DUN SEKINCHAN - 19 PERMOHONAN |
2 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN AHLI DEWAN (ADN) SELANGOR, PEGAWAI PENYELARAS DUN DAN AHLI PARLIMEN DAERAH SABAK BERNAM YANG TELAH LENGKAP DI HANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 269 PERMOHONAN | 100 | JULAI : 57 OGOS : 111 SEPTEMBER : 101 |
3 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN ELAUN MENGHADIRI MESYUARAT / PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG TRADISI (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | 1890 TUNTUTAN | 100 | JULAI : 663 OGOS : 637 SEPTEMBER : 590 |
4 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENYELARASAN DOKUMEN MINIT MESYUARAT JPKK / KAMPUNG BAGAN BARU DAN TERSUSUN | 7 HARI | 36 TUNTUTAN | 100 | JULAI : 12 OGOS : 12 SEPTEMBER : 12 |
5 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PEMBAYARAN ELAUN MENGHADIRI PROGRAM / MESYUARAT KETUA KOMUNITI INDIA (KKI) | 7 HARI | 46 TUNTUTAN | 100 | JULAI : 16 OGOS : 14 SEPTEMBER : 16 |
6 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENGELUARAN PERUNTUKAN PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM DALAM TEMPOH 7 HARI BEKERJA | 7 HARI | 306 TUNTUTAN | 100 | JULAI : 119 OGOS : 82 SEPTEMBER : 105 |
7 | MENGURUS PERMOHONAN PERUNTUKAN PROJEK KECIL INFRASTRUKTUR ( TERIMA PERMOHONAN, LAWATAN TAPAK, PENYEDIAAN BUTIRAN KERJA). SURAT TAWARAN, PEMANTAUAN DAN BAYARAN TERMASUK PROJEK JENIS BEKALAN YANG TELAH DILULUSKAN DI BAWAH PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN). | 4 MINGGU | 8 | 100 | ADN SEKINCHAN - 1 ADN SG. AIR TAWAR - 4 ADN SG.PANJANG - 1 PKM SG.PANJANG - 1 PKM SABAK - 1 |
| 8 | PENYEDIAAN DAN PENGELUARAN SURAT TAWARAN KEPADA KONTRAKTOR PROJEK KECIL INFRASTRUKTUR BAGI PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN), PENYELARAS DUN DAN PENYELARAS PARLIMEN. | 4 MINGGU | 8 | 100 | ADN SEKINCHAN - 1 ADN SG. AIR TAWAR - 4 ADN SG.PANJANG - 1 PKM SG.PANJANG - 1 PKM SABAK - 1 |
| 9 | PELAKSANAAN PROJEK INFRASTRUKTUR BAGI PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN), PENYELARAS DUN DAN PENYELARAS PARLIMEN (SEHINGGA PROJEK SIAP DILAKSANAKAN) | 6-8 MINGGU | 8 | 100 | ADN SEKINCHAN - 1 ADN SG. AIR TAWAR - 4 ADN SG.PANJANG - 1 PKM SG.PANJANG - 1 PKM SABAK - 1 |
LAPORAN PENCAPAIAN BAHAGIAN PEMBANGUNANSUKU KE-4 (OKTOBER - DISEMBER) TAHUN 2025
| |||||
BIL | URUSAN | PETUNJUK PRESTASI(TEMPOH PELAKSANAAN) | PENCAPAIAN TAHUN | CATATAN | |
KUANTITI | PERATUS % | ||||
1 | MEMBERI MAKLUMBALAS KEPADA PERMOHONAN INFRASTRUKTUR YANG DITERIMA | 7 HARI | |||
2 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN AHLI DEWAN (ADN) SELANGOR, PEGAWAI PENYELARAS DUN DAN AHLI PARLIMEN DAERAH SABAK BERNAM YANG TELAH LENGKAP DI HANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | |||
3 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN ELAUN MENGHADIRI MESYUARAT / PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG TRADISI (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM | 7 HARI | |||
4 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENYELARASAN DOKUMEN MINIT MESYUARAT JPKK / KAMPUNG BAGAN BARU DAN TERSUSUN | 7 HARI | |||
5 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PEMBAYARAN ELAUN MENGHADIRI PROGRAM / MESYUARAT KETUA KOMUNITI INDIA (KKI) | 7 HARI | |||
6 | MEMASTIKAN PERMOHONAN TUNTUTAN BERKAITAN PENGELUARAN PERUNTUKAN PROGRAM OLEH JAWATANKUASA PEMBANGUNAN DAN KESELAMATAN KAMPUNG (JPKK) YANG TELAH LENGKAP DIHANTAR KE UNIT KEWANGAN PEJABAT DAERAH DAN TANAH SABAK BERNAM DALAM TEMPOH 7 HARI BEKERJA | 7 HARI | |||
7 | MENGURUS PERMOHONAN PERUNTUKAN PROJEK KECIL INFRASTRUKTUR ( TERIMA PERMOHONAN, LAWATAN TAPAK, PENYEDIAAN BUTIRAN KERJA). SURAT TAWARAN, PEMANTAUAN DAN BAYARAN TERMASUK PROJEK JENIS BEKALAN YANG TELAH DILULUSKAN DI BAWAH PERUNTUKAN AHLI DEWAN UNDANGAN NEGERI (ADN). | 4 MINGGU | |||